Process Control Cable Installation

Process Control Cable Installation for a major Offshore Wind Developer based in Germany
Responsibilities

  • Managing the interface between the sectional projects and the cable supplier.
  • Collecting and consolidating cable installation clearance dates from the sectional projects.
  • Identifying, discussing and resolving resource and installation clearance conflicts regarding installation planning between the sectional projects and with the cable supplier.
  • Overall coordination of installation planning with the cable supplier, review and binding agreement of the installation plan with the supplier, taking into account the construction clearance windows section by section.
  • Feeding back installation dates into the sectional projects, assisting with the integration into the section schedules.
  • Supporting the planning of downstream processes (fiber optic installation, cable testing, backfilling) considering construction clearance windows and resources on the supplier side.
  • Supporting the scheduling manager for cables in maintaining the framework and contract schedules and coordinating interfaces with other trades (substations, permitting)
  • Monitoring and verifying construction clearance and installation dates and data maintenance in the “construction portal” (MS Dynamics), entry of baseline dates and comparison with actual dates across all sectional projects.
  • Preparation, execution and documentation of service call-offs to the cable supplier.
  • Documentation and reporting of the coordination processes and service call-offs

Requirements

  • Completed university degree in engineering or equivalent.
  • At least 5 years of relevant experience in the execution and management of projects within the energy sector.

At least 5 years of relevant experience in schedule planning/schedule management for projects in the field of infrastructure or linear construction sites (pipeline/cable).